Component Scrap 

Use

You use this function to plan the scrap of a component that may break during production of an assembly.

Prerequisites

You have entered values for calculating component scrap in the material master or the BOM:

The component scrap quantity maintained for a material component in the BOM has the higher priority.

Features

Example

Estimate yield

200

Assembly scrap

10%

Component scrap

10%

This results in a scrap quantity of

42 pieces

and a required quantity of

242 pieces