Assembly Scrap 

Use

You use this function to plan the scrap that results from the production of an assembly.

Prerequisites

You have maintained the assembly scrap in the material master (MRP 1 view) as a percentage in the Assembly scrap field for the assembly header material.

Features

The system automatically increases the quantity to be produced by the percentage of scrap.

However, the system always uses the estimate yield for the availability calculation for the assembly. Furthermore, the estimate yield of the assembly is always displayed in the MRP list or in the stock/requirements list.

Assembly scrap increases the order quantity of the assembly and subsequently increases the order quantity for corresponding components. The dependent requirements of the material components are therefore increased correspondingly.

Example

Estimate yield

200

Assembly scrap

10%

This results in a scrap quantity of

20 pieces

and a required quantity of

220 pieces