Check the Consistency of the Planning File
Use
Since the entries in the planning file are permanent, you must check their MRP relevancy regularly. If, for example, a plant is subsequently excluded from material requirements planning, its materials will still be included in the planning file. The same applies for materials that are subsequently flagged with the MRP type No MRP and are thus excluded from MRP. In such cases, you should delete the entries in the planning file.
Procedure
The initial screen for checking consistency now appears.
Result
If one of these criteria no longer applies, the respective entry is deleted from the planning file.
If the low-level code no longer corresponds to the one in the material master record, the entry is deleted from the planning file and a new one is created with the current low-level code.