Show TOC

Costing date

Definition

In the field "Costing date", you can specify the date for which the system looks for a valid material cost estimate in the database for Product Cost Controlling. Thus the system looks for a material cost estimate for which the valid-from date corresponds to the date you entered.

When you define a costing key, you can enter either a costing date or a period or a value for the period indicator.

Costing date in Product Cost Controlling