With this function you can define for each material type whether a new batch can be created via the batch master transaction and, if so, how it is created.
It should not be possible to assign a batch manually for finished products. The batch numbers should always be determined automatically by the system. To ensure they are determined automatically, choose the option C - automatic / No manual creation for the material type FERT.
If batch numbers are to be assigned automatically, internal batch number assignment must be set up. To do this, read the section Batch Number Assignment.
The standard system is configured to create the batch automatically or manually without check as before.
When the system checks against an external number range, it checks the number range 02 in the standard configuration for BATCH_CLT. However, this interval is not provided with the standard system. Please maintain it in the section Batch Number Assignment.