Request/Dunning of Expiring Vendor Declarations 
Use
This function identifies vendor declarations that are due to expire. If a declaration expires, it is no longer valid proof of a product's origin. For vendor declarations due to expire, the system can print a series of letters requesting vendors to send you updated declarations.
Integration
Data Structures
The information about whether a valid vendor declaration exists for a vendor material is stored for each preference zone in the LFEI database table. This database is linked to the purchasing info record. The following example illustrates the structure:
Plant |
Pref.customs zone area |
VDI |
Vendor dec. date |
DC |
Last dunned |
0001 |
MOEL |
A |
12.31.1996 |
0 |
|
0001 |
CARI |
B |
12.31.1996 |
0 |
|
0001 |
EFTA |
C |
12.31.1996 |
0 |
|
0001 |
MEDI |
D |
12.31.1996 |
0 |
Below the terms in the table are explained in more detail.
Plant
This is the plant to which the specifications refer.
Preference customs zone area
This is the preference zone for which the vendor declaration indicator is valid.
VDI (Vendor Declaration Indicator)
Possible settings for the VDI are
Possible Settings for the VDI
A |
Not checked - no specifications from the vendor |
B |
Checked - marked as originating goods by the vendor |
C |
Checked - originating. Long-term declaration exists (no dunning will be carried out since this vendor declaration is valid until canceled by the vendor) |
D |
Checked - vendor cannot confirm as originating goods |
Vendor declaration date
This is the date on which the vendor declaration expires. If this date exceeds the number of tolerance days in the settings (carried out in Customizing for Foreign Trade), then the vendor is sent a letter/dunning letter, depending on the dunning code. The validity date for the vendor declaration, dunning code, and the dunning date are identical for each material and plant in all preference zones.
DC (Dunning Code/Dunning Level)
This value is increased according to the number of letters sent to the vendor:
Dunning Code / Level
Code |
Description |
0/ |
First letter to the vendor. This is sent when the vendor declaration has ceased to be valid for longer than the number set for "tolerance days 1." The system then sets the matchcode to ‘1’ and the dunning date is set to the current date. |
1 |
First dunning letter to the vendor. This is sent when the vendor declaration has ceased to be valid for longer than the number set for "tolerance days 1" and when the number set for "tolerance days 2" has been exceeded. The system then sets the matchcode to "2" and the dunning date is set to the current date. |
2 |
First dunning letter to the vendor. This is sent when the vendor declaration has ceased to be valid for longer than the number set for "tolerance days 1" and when the number set for "tolerance days 3" has been exceeded. The system then sets the matchcode to "3" and the dunning date is set to the current date. |
Last dunned
Date on which dunning was carried out last.

SAP recommends that you use indicator "B" for the vendor declaration indicator. Preference determination checks the validity date of the vendor declaration when "B" is set. A long-term declaration is only valid for one year by law. "Long-term" simply refers to the option to renew.