Request/Dunning of Expiring Vendor Declarations 

Use

This function identifies vendor declarations that are due to expire. If a declaration expires, it is no longer valid proof of a product's origin. For vendor declarations due to expire, the system can print a series of letters requesting vendors to send you updated declarations.

Integration

Data Structures

The information about whether a valid vendor declaration exists for a vendor material is stored for each preference zone in the LFEI database table. This database is linked to the purchasing info record. The following example illustrates the structure:

Plant

Pref.customs zone area

VDI

Vendor dec. date

DC

Last dunned

0001

MOEL

A

12.31.1996

0

 

0001

CARI

B

12.31.1996

0

 

0001

EFTA

C

12.31.1996

0

 

0001

MEDI

D

12.31.1996

0

 

 

Below the terms in the table are explained in more detail.

Plant

This is the plant to which the specifications refer.

Preference customs zone area

This is the preference zone for which the vendor declaration indicator is valid.

VDI (Vendor Declaration Indicator)

Possible settings for the VDI are

Possible Settings for the VDI

A

Not checked - no specifications from the vendor

B

Checked - marked as originating goods by the vendor

C

Checked - originating. Long-term declaration exists (no dunning will be carried out since this vendor declaration is valid until canceled by the vendor)

D

Checked - vendor cannot confirm as originating goods

 

Vendor declaration date

This is the date on which the vendor declaration expires. If this date exceeds the number of tolerance days in the settings (carried out in Customizing for Foreign Trade), then the vendor is sent a letter/dunning letter, depending on the dunning code. The validity date for the vendor declaration, dunning code, and the dunning date are identical for each material and plant in all preference zones.

DC (Dunning Code/Dunning Level)

This value is increased according to the number of letters sent to the vendor:

Dunning Code / Level

Code

Description

0/

First letter to the vendor. This is sent when the vendor declaration has ceased to be valid for longer than the number set for "tolerance days 1." The system then sets the matchcode to ‘1’ and the dunning date is set to the current date.

1

First dunning letter to the vendor. This is sent when the vendor declaration has ceased to be valid for longer than the number set for "tolerance days 1" and when the number set for "tolerance days 2" has been exceeded. The system then sets the matchcode to "2" and the dunning date is set to the current date.

2

First dunning letter to the vendor. This is sent when the vendor declaration has ceased to be valid for longer than the number set for "tolerance days 1" and when the number set for "tolerance days 3" has been exceeded. The system then sets the matchcode to "3" and the dunning date is set to the current date.

 

Last dunned

Date on which dunning was carried out last.

SAP recommends that you use indicator "B" for the vendor declaration indicator. Preference determination checks the validity date of the vendor declaration when "B" is set. A long-term declaration is only valid for one year by law. "Long-term" simply refers to the option to renew.