The system displays the overview of all components for the material.
The system displays the dialog box Select operations.
The system posts the target times for operations that were not selected.
Result
The planned activities are replaced by the actual activities. After posting, the system then calculates the actual production activities on the basis of the actual times. These activities can be evaluated in Product Cost by Period.