Installing the New Pump 

  1. On the Functional Location Structure: Structure List screen, select the following functional location:
  2. Europe

    North America

    K1-ZPW-2

    C1-ZPW-2

  3. Choose List ® List editing ® Change.
  4. Choose the Structure tab page.
  5. No equipment has yet been stored in the Equipment screen area.

  6. To install the new pump, choose .
  7. Position your cursor on the Equipment column, then choose the F4 input help.
  8. Enter the following data:
  9. Field

    Europe

    North America

    Description

    Material

    P-1001

    P-1001

    Pump GG Etanorm 200-1000

    Created on

    Today's date

    Today's date

     

    If you are not on the Display Equipment: Equipment Selection screen, choose and select Equipment by Equipment list.

  10. Choose .
  11. Your three newly created pieces of equipment will be displayed. You have already taken the first piece of equipment from the warehouse in a previous process step. This must now have the status AVLB.

  12. To check the status, select the first piece of equipment, then choose .
  13. The status is AVLB (Equipment available).

  14. Choose .
  15. To select the equipment, choose .
  16. Choose .
  17. The equipment you select is adopted.

  18. Choose .
  19. You can see the installed pumps immediately.

  20. Choose .

Result

You have now installed the new pump in the functional location Inlet pump plant - screening plant.