Show TOC

Transferring Cost Planning Results to Controlling : Redesign

Description

The interface and functionality used to transfer Personnel Cost Planning results to Controlling (CO) has been redesigned and enhanced.

To transfer your cost planning results to CO, you simply select a plan scenario and restrict this to a controlling area and a fiscal year. You can now decide in to which CO version the data is posted. You can set up these CO versions when you configure the Controlling component and this means that the CO administrator can determine whether the results are posted to a real CO version or just to a CO version from which the CO administrator can transfer the posting data. Depending on how you configure your system, you can set up a one-level or two-level transfer process.

You can now display the transfer status in the release administration function. This means that you can see what has been posted and what is still to be posted per controlling area and fiscal year.

Dependent Functions

The new interface affects the data transfer when the Personnel Cost Planning and the Controlling components are in distributed systems. For detailed information on how to configure your system if such a scenario exists, refer to the Personnel Cost Planning ALE scenario online documentation and configuration documentation.

Further Notes

For additional information, refer to the Personnel Cost Planning online documentation under Integration with CO and the following CO release note Transfer of Planning Data from HR .