Assigning Material Components 

Procedure

  1. In the main R/3 menu, choose: Logistics ® Production ® Master data ® Routings and then Routings ® <Type of Routing> ® Create.
  2. On the initial screen, enter the material of the production lot, the plant of the material in the appropriate fields and enter the production lot number in the WBS element field.
  3. Choose Enter.
  4. The operations overview of the routing screen appears for your production lot.

  5. Choose Goto ® Comp. alloc. - gen.

The table shows which screen appears.

 

Navigation when calling up the material component overview

If you have created the following for the production lot

The following screen appears:

WBS BOM

Material Component Overview

No WBS BOM, but exactly one material BOM for the material of the WBS BOM

Material Component Overview

No WBS BOM, but several material BOMs for the material of the WBS BOM

The Choose alternative BOM dialog box. Select the BOM whose components you would like to assign and choose Select.

 

  1. Select the material components that you would like to assign to an operation.
  2. Choose Edit ® New allocation.
  3. The New allocation. dialog box appears.

  4. Enter the operation and the sequence, to which you would like to assign the material components. You can:

– Directly assign the material components

– Assign the material components via the operations list.

To receive a list of the operations to which you can assign the material components, choose Oper./act. list (operation list) in the New allocation dialog box. You then select the operation from the list.

  1. Choose Enter.

Result

The components are assigned to the operation.