Structural Changes (IMG) in Profit Center Accounting
Scope of Functions
Basic Settings
- The new structure node Settings for the Controlling Area has
been added. The following have been assigned to this node:
1. The activity Maintain Controlling Area Settings (previously under Basic settings)
2. The new structure node Activate Updating. The following have been assigned to this node:
a) Set Control Parameters for Actual Data (previously under Actual postings)
b) Plan Versions (also contained under Planning->Basic Settings for Planning) including
- previously existing activity Maintain Plan Versions
- new activity Adjust Line Items and Summary Records
- The structure node Carry Balance Forward has been inserted,
together with all of its subnodes (previously under Actual Postings)
- The activity Maintain Document Summarization has been moved to Tools.
Enterprise Organization
This is a new main node. It contains the new activities
1. Set Active Plan Version
2. Create Enterprise Organization
3. Generate Standard or Alternative Hierarchy from Enterprise Organization
Master Data
- The structure node Statistical Key Figures (previously main node
) has been inserted. The following nodes have been assigned to this:
1. new activity Maintain Statistical Key Figures
2. new activity Maintain Statistical Key Figure Groups
3. existing activity Choose Statistical Key Figures
- The entire main node Master data is now divided into three structure nodes: Profit Center,
Statistical Key Figures and Representative Materials.
Assignments to Profit Centers
All previously existing activities, which must/can be carried out for
the assignment of sales orders, are now assigned to the structure node Sales Orders.
Transfer Prices
- The Pricing structure node has been removed and replaced with the
1. new activity Basic Settings for Pricing. This also replaces the
following activities, which were previously assigned to the Pricing structure node:
- Define Variants for Transfer Prices
1. Detail Control for Pricing structure node. The remaining activities which were previously under
Pricing have been assigned to this structure node.
- The activity Define Valuation Clearing Account has been moved to the Implementation Guide (IMG) for
General controlling.
- The structure node Account Determination has been renamed as Settings for Internal
Goods Movements. The existing activity Define Special Handling for Internal Goods movement
has also been assigned to this structure node.
- previous subnodes to this node are now therefore one level higher.
- The structure node Quantity-Based Planning of Goods Movements, previously under Planning
, has been inserted here together with all of its subnodes, and renamed Profit Planning.
Another new subnode has been inserted here, the activity Update Material Direct Costs for Plan Quantities
.
Planning
- The following nodes have been inserted beneath the structure node Basic Settings for Planning
1. new structure node Define Number Ranges. The following belong to this node:
a) the activity Define Number Ranges for Local Documents, previously known as Maintain
Number Ranges
b) new activity Maintain Number Ranges for Rollup
2. new structure node Maintain Document Types. The following belong to this node:
a) the activity Define Document Types for Local Documents, previously known as Define
Document Types
b) new activity Maintain Document Types for Rollup
3. structure node Plan Versions (also under Planung->Basic Settings for Planning
). The following are positioned beneath this structure node in the hierarchy:
a) existing activity Maintain Plan Versions
b) new activity Adjust Line Items and Summary Records
- The structure node Quantity-Based Planning of Goods Movments (also under Transfer
Prices) has been renamed Profit Planning. Another subnode has been inserted here, the activity
Update Material Direct Costs for Plan Quantities.
- The new structure node R/3 Internal Plan Data Transfer has been
inserted. The following are assigned to this node:
- structure node Transfer of Plan Data from Costing-Based CO-PA, together with its subnodes
a) existing activity Maintain +/- Sign Rules
b) existing activity Maintain Account Determination
c) new activity Execute Data Transfer
1. existing activity Transfer CO Plan Data (previously under Tools->R/3 Internal Data Transfer
)
2. the activity Statistical Key Figures: Transfer Plan Opening Balance , previously known as
Transfer Plan Opening Balance and positioned beneath the main node Statistical Key Figures.
- The new structure node Allocations has been inserted. The following are assigned to this node:
a) new activity Define Distribution
b) new activity Creat Assessment Cost Elements
c) new activity Define Assessment
d) new activity Maintain Field Usage
Actual Postings
- Activity Set Control Parameters for Actual Data has been moved to Actual
Postings->Controlling Area Settings ->Activate Updating.
- The node Supplements for Document Entry no longer exists.
- The new structure node Basic Settings - Actual has been inserted. The following are assigned to this node:
1. existing activity Define Number Ranges for Local Documents
2. existing activity Maintain Document Types
- The new structure node Manual Entry Using a Layuut has been
inserted. The following are assigned to this node:
1. new activity Maintain Layout for Document Entry
2. new activity Maintain Layout for Entry of Statistical Key Figures .
- The structure node Carrying Forward of Balances has been move to Basic Settings
, together with all of its subnodes.
- The new structure node Period-End Closing has been inserted. The following are assigned to this node:
1. new activity Define Distribution
2. new activity Create Assessment Cost Elements
3. new activity Define Assessment
4. new activity Maintain Field Usage
- The new structure node Transferring Selected Line Items has been
inserted. The following are assigned to this node:
1. new activity Generate Opening Balance for Payables and Receivables
1. new activity Generate Opening Balance for Material Stocks
2. new activity Generate Opening Balance for Work in Process
3. new activity Generate Opening Balance for Asset Portfolios
4. new activity Perform Account Control for Valuation Differences
- The new structure node R/3 Internal Data Transfer has been
inserted. The following are assigned to this node:
1. the following activities which were previously positioned under Tools->R/3 Internal Data Transfer
a) Transfer CO Actual Data Periodically
b) Select and Transfer CO Actual Data
c) Transfer FI Actual Data
d) Transfer MM Actual Data
e) Transfer SD Billing Documents
2. the activity Statistical Key Figures: Transfer Actual Opening Balance, previously known as
Transfer Actual Opening Balance and positioned beneath the main node Statistical Key Figures
- The structure node Preparations for Consolidation/ Determining Partner Profit Centers
has been changed into a main node, together with all its subnodes (see the following section).
Preparations for Consolidation
Together with its subnodes, this main node (Preparations for Consolidation/Determining Partner
Profit Centers was previously positioned under Actual Posting as a structure node.
Statistical Key Figures
- The main node Statistical Key Figures has been moved to Master Data.
- The activity Transfer Actual Opening Balance has been renamed Statistical Key Figures:
Transfer Actual Opening Balance and moved to Actual Postings -> R/3 Internal Data Transfer
- The activity Transfer Plan Opening Balance has been renamed Statistical Key Figures:
Transfer Plan Opening Balance and moved to Planning -> R/3 Internal Plan Data Transfer.
Information System
- The activity Maintain report tree no longer exists.
- The order of the subnodes to the structure node Drilldown Reporting
has been changed, and the following activities added:
1. Maintain Key Figures
2. Maintain Variables
3. Maintain Form
4. Maintain Report
- The structure node Report Writer has been removed.
1. The subnodes previously assigned to this have been assigned to the structure node Report Painter.
2. The activity Define Report List no longer exists.
- The following now appear beneath the structure node Report Painter in the hierarchy:
1. the activities which previously appeared beneath the structure node Report Writer
2. the new activities:
a) Specify Report Languages
b) Maintain Libraries
c) Generate Reports
Tools
- The new activity Change Message Control has been added.
- The node Distribution (ALE) has been renamed as Set Distribution of Profit Center Data
(ALE). The following new activities have been assigned to this node:
1. Maintain Field Movement
2. Maintain Substitution
3. Assign Field Movement to Company Code
- The structure node Transport Settings for Actual Postings has
been added. The following are now assigned to this structure node:
1. the activity Transport Control Settings for Actual Postings, previously known as
Transport Settings for Actual Postings and assigned to the structure node Transport Customizing
Settings
the new activity Transport Layout
the new activity Import Layout
- The new structure node Customer Enhancements has been added. The following have been assigned to this node:
1. The activity Choose Activities for Exit PCASELEK, which was previously assigned to the main node
Basic Settings and known as Maintain Activities
2. The new activity Develop Enhancements for Profit Center Accounting
- The existing activity Maintain Document Summarization has been inserted (previously under Basic Settings).
- The new structure node Preparations for Productive Start (Prepare Production Startup)
has been inserted. The following are assigned to this:
1. the existing structure node Delete Test Data together with the subnodes assigned to it
2. the existing structure node R/3 Internal Data Transfer. All data
transfer activities which are relevant for the productive start have
been assigned to this node. The activities can also be found as subnodes under the following nodes:
a) Actual Postings->R/3 Internal Data Transfer
b) Planning->R/3 Internal Plan Data Transfer
c) Actual Postings->Transferring Selected Line Items
- The new activity Convert to Release 4.6 - Allocation Cycles has been added.
- The structure node Conversion from Release 2.x to 4.5 has been renamed as Conversion