Assigning a Revision Level to a Material 

Use

You can assign a revision level to a material either from an engineering change management function or while you are processing a material master record or BOM for the material.

This section explains how to change the revision level from engineering change management functions.

Prerequisites

You can only assign a revision level to a material that has a material master record.

Procedure

From the Engineering Change Management menu, choose the Revision level option. The following options are available: create, change, and display material revision level.

To create a revision level for a material:

  1. Choose Logistics ® Central functions ® Engineering Change Management ® Revision Level ® Create.

You see the Create Revision Level: Initial Screen.

  1. Enter the material that you want to assign a revision level to and select .

You see the Create Revision Level: Detail.

  1. Enter the change number that you want to assign a revision level to.
  1. The possible entries in the Revision level field depend on your company-specific settings (Customizing for Engineering change management under Set up control data).

You can define the settings in Customizing such that a higher revision level must be assigned for both external and internal number assignment.

A message appears telling you which revision level has been assigned to the material.

  1. Save the revision level for your material.

When assigning the revision level from the processing functions for the material master or the bill of material, you find the functions for maintaining the revision level under the menu option Extras.