Show TOC
Changes to the IMG Structure
Scope of Functions
The ways in which the IMG structure for Profitability Analysis in
Release 4.6A differs from that in Release 4.5B are listed below:
- Structures -> Define Operating Concern
The new node "Operating Concern Templates" has been added under this
node, along with the new activity "Use SAP Operating Concern Template" and the existing activity "Copy Operating Concern including
Customizing".
- Master Data -> Valuation -> Define Conditions and Costing Sheets.
Under this node, the activities "Create Condition Types" and "Maintain
Costing Sheets" have been combined into a single activity: "Create Condition Types and Costing Sheets".
- Planning -> Manual Planning
Under this node, the following changes have been made:
- The new activity "Prepare Initial Planning Screen" has been added under this node.
- The new node "Aids for Changeover to the Initial Planning Screen" has
been added, Under this new node, you now find the activity "Display
Planner Profiles" (which corresponds to the old activity "Define
Planner Profiles" in the display mode) and the new activity "Create Planning Level from Planning Layout".
- Planning -> Integrated Planning -> Transfer Cost Center Planning/Process Planning
Under this node, the following changes have been made:
- Under the "Initial Steps" node, the new activity "Assign Characteristic Groups to Plan Cycles" has been added.
- The nodes "Define Assessment of Cost Center Costs" and "Assessment of
Process Costs" have been combined into the single activity "Assess Cost
Center Costs / Process Costs". The new activity "Display Cycle Overview of Plan Assessment" to this node.
- Under the "Direct/Indirect Activity Allocation" node, the activities
"Set Up Indirect Allocation of Activities from Cost Centers" and "Set
Up Indirect Allocation of Activities from Processes" have been combined
into the single activity "Set Up Indirect Allocation of Activities from
Cost Centers/Processes". Furthermore, the new activity "Display Cycle Overview of Plan Activity Allocation" has been added here.
- The node "Dynamic Process Cost Allocation" has been renamed "Set Up
Template Allocation". Similarly, the term "process template" has been
replaced by the term "template" in all the activities under this node.
Moreover, the activity "Define Characteristics for Selection and for
Update" has been renamed "Specify Characteristics for Selection and Update".
- Actual Flows of Values -> Initial Steps
The following changes were made under this node:
- Under the "Characteristic Groups" node, the activity "Assign
Characteristic Groups" has been renamed "Assign Characteristic Groups
for Assignment Screen" and the new activity "Assign Characteristic Groups for Line Item Screens" has been added.
- The new node "Value Field Groups", containing two new activities, has also been added.
- Actual Flows of Values -> Transfer of Overhead
The following changes were made under this node:
- Under the "Initial Steps" node, the new activity "Assign Characteristics to Actual Cycles" has been added.
- The nodes "Assessment of Cost Center Costs" and "Assessment of Process
Costs" have been combined to form one node: "Assess Cost Center Costs /
Process Costs". The new activity "Display Cycle Overview of Actual Assessment" has been added under this new node.
- Under the "Direct/Indirect Activity Allocation" node, the activities
"Set Up Indirect Allocation of Activities from Cost Centers" and "Set
Up Indirect Allocation of Activities from Processes" have been combined
into one activity: "Set Up Indirect Allocation of Activities from Cost
Centers/Processes". Furthermore, the new activity "Display Cycle Overview of Actual Activity Allocation" has been added.
- The "Dynamic Process Cost Allocation" node has been renamed "Set Up
Template Allocation". Equally, the term "process template" in the subordinate activities has been replaced by the term "template".
Furthermore, the activity "Define Characteristics for Selection and for
Update" has been renamed "Specify Characteristics for Selection and Update".
The following changes have been made under this node:
- The node "Summarization levels" has been added, including the new
activity "Have proposal created automatically" alongside the existing activity "Define Summarization Levels".
- Under the "Analysis" node, the new activities "Simulate Billing
Document Transfer" and "Check Value Flow from Order/Project Settlement" have been added.
- Under the "Production Startup" node, the new activity "Delete Transaction Data" has been added.