Show TOC
Structural Changes to the IMG for Product Cost Planning
Scope of Functions
The IMG structure in Product Cost Planning has been changed as follows:
1. Basic Settings for Material Costing
This section now contains Error Management.
2. Cost Estimate with Quantity Structure
This section contains the settings for the costing variant and its components, as well as for quantity structure control.
The sections Mixed Costing, Costing in Joint Production and
Develop Enhancements for Material Costing have been moved to Selected Functions.
The section Define Order Type Determination has been deleted.
This pre-costing activity is no longer required.
3. Cost Estimate Without Quantity Structure
This section contains the settings for the costing variant and its components.
4. Selected Functions in Material Costing
The name of this section has been changed from Special Processing to Selected Functions
. The section contains all the settings for the material costing functions with or without quantity structure.
1. Reference and Simulation Costing
This section contains the basic settings for Reference and Simulation Costing, including overhead, process costs, and under
Error Management, the activity Define User-Defined Message Types.
2. Price Update
The section Parameters for Standard Cost Estimates now includes the activity
Define User-Defined Message Types.
See also
For more information, see the Implementation Guide (IMG) for Product Cost Controlling.