Checking the Change Request 

  1. Switch back to the IDES session for user WF-PP-P .
  2. Call up the transaction as follows:
  3. Menu Path

    Office ® Workplace ® Inbox ® Workflow

    Transaction Code

    SBWP

  4. Select your engineering change request and choose .
  5. When you have checked the request, choose (with the Status Management function key).
  6. Choose Request Checked in the dialog box.
  7. The System status field now confirms the change request status to be CRTD CC01.

  8. Choose Continue.
  9. Choose .
  10. Choose .

Do not log off, the next step is performed by the same user.