Preparing Requirements Grouping
Implementation Options
This process describes the sequence of preparations necessary in order to be able to use requirements grouping for planning projects, in addition to the master data that you have to maintain.
Prerequisites
For period lot sizes, such as MB (monthly lot size), you have set the indicator to 2 for Lot size as in planning horizon in the MTO lot size field, in Customizing for MRP, in the IMG activity Check lot-sizing procedure.
This causes the system to actually use the monthly lot size in the lot-size calculation for MRP in individual project planning, if you have entered MB into the material master. If you have not set this indicator, the planning run then creates a procurement proposal with lot-for-lot order quantity for every requirement in the segment of the MRP element.
Process Flow
You can find further information on WBS elements and networks in the SAP document PS – Project System under
Work Breakdown Structure (WBS) and Network.