Proceed as follows:
Double-click on a flow.
Position the cursor on a flow and click on the Choose function.

If the cash flow contains several flows of the same flow type, and these flows have been derived from a condition, you must post the flows in chronological order, from the oldest to the most recent.
If you fail to do this, the system will delete any planned flows dated earlier than the flow to be posted which have the same flow type.