In Release 3.0, the following changes were made to the menus in the Project System:
PS Application Menu
The PS application menu was revised and divided into individual area menus:
Menu option: Network/Standard network
The menus for networks and standard networks were completely revised and restructured. In the English version, library network was renamed standard network.
All the menu options under the path Additional functions - > Details were moved out from menu Additional functions and introduced as a separate menu option Details . In the English version, the menu option Additional functions was renamed Extras .
Please refer to release notes on networks, standard networks and English terminology for more information on individual changes.
Menu option: Work breakdown structure
The menu for the work breakdown structure was revised. All the menu options under the path Additional functions - > Details were moved out from menu Additional functions and introduced as a separate menu option Details. In the English version, the menu option Additional functions was renamed Extras.
Please refer to the release notes on work breakdown structures and English terminology for more information on individual changes.
Menu option: Time scheduling
The menu option for WBS scheduling was revised.
Please refer to the release note on time scheduling for more information on individual changes.
Menu option: Planning/Budget management
The menus were completely revised. The different views can now be called directly via Views . The functions check, copy view and total up were removed from the menu Additional functions and placed under Planned values or Edit. The menu Format was renamed Settings.