Setting the Status of Structure Items 
Procedure
You can specify the processing status of a structure item. To do this:

Only the assigned owner of a structure item can change its status.
When you change the status of a structure item that has subordinate structure items assigned to it, the status is also changed for all subnodes. This overwrites any previous status. It is, however, still possible to change the status of subnodes.