Check Control Keys for Operations

Each operation or suboperation in a routing or work order must be assigned to a control key. The control key specifies whether the following functions are possible for the operation:

You define which control keys are taken into account in costing here. If you set the Costing indicator, the costs for this operation will be calculated. If you do not set an indicator, the operation is ignored in costing.

Standard settings

The standard system contains predefined control keys.

Actions

1. Decide which control keys are relevant for costing.
2. Select the Detail control key and set the Costing indicator.
3. Save the changes.