Show TOC
BOM item
explosion type
Definition
This indicator is used to determine which
version of an item is valid for a BOM explosion.
Use
The indicator is only relevant to a BOM item
if:
- the item has been processed with reference to
a change number that is valid after the valid from
date and
- the valid-from date (in the change header or
alternative date) has been shifted, such that the date shift changes the
sequence of validity periods of a BOM item.
The changed sequence of validity periods for a
BOM item result in two item validity periods overlapping. Different versions
of an item with different change numbers exist in this overlap
period.
Using this indicator you define whether and by
what rules the system determines a unique change status when you display,
evaluate or change a BOM to a date in the overlap
period
Procedure
Set one of the following values:
- Value ' ' (Blank): All versions of an
item
Within the overlap
period the system determines all the versions of the item. Each version is
listed with the same item number and the different change
numbers.
- Value 1: Version created most
recently
If more than one
item version is valid during the overlap period, the system only determines
the most recently created item.
- Value 2: Version with latest
valid-from date
If several items are
valid on a specific date during the overlap period, the system determines the
item with the most recent valid-from date.