Supplements
|
Values | ||||
Fields |
Time Ticket Entry |
Form DL08 Original Time Ticket |
Form DL09 Subsequent Time Ticket | |
Time ticket type |
01 (Premium time ticket) |
|||
Personnel number |
1220 (Georg Spitz) | |||
Month |
9 | |||
Day |
22 | |||
Master pay scale group |
A04 (DM 23.34) | |||
Wage type |
ML01 (piecework time) | |||
Formula |
000 (target/actual) |
|||
Labor time |
Confirmation value |
8 (hours) |
8 (hours) |
8 (hours) |
|
Target value |
6 (hours) |
|||
Labor utilization rate |
75% |
75% |
100% | |
Rate |
DM 23.34 | |||
Amount |
DM 186.72 | |||
Capping
|
Values | ||||
Fields |
Time Ticket Entry |
Form DL08 Original Time Ticket |
Form DL09 Subsequent Time Ticket | |
Time ticket type |
01 |
|||
Personnel number |
1220 | |||
Month |
9 | |||
Day |
22 | |||
Master pay scale group |
A04 | |||
Pay scale group in time ticket |
A06 (DM 25.68) | |||
Wage type |
ML01 | |||
Formula |
100 (target / actual with setup time) |
|||
Yield |
90 (units) |
|||
Control yield |
10 (units) |
|||
Labor time |
Confirmation value |
6 (hours) |
6 (hours) |
6 (hours) |
|
Standard value |
1 (hours) |
|||
|
Target value |
9 (hours) |
|||
Setup time |
Confirmation value |
2 (hours) |
||
|
Target value |
3 (hours) |
|||
Labor utilization rate |
150% |
150% |
140% | |
Rate |
DM 25.68 | |||
Amount |
DM 215.71 | |||
Time wage
The hourly wage in the time wage takes into account the average of the last two months.
|
Values | |||||
|
Entering Time Ticket |
Form DL08 Original Time Ticket |
Form DL09 Subsequent Time Ticket | ||
Time ticket type |
04 (Time wage ticket) |
||||
Personnel number |
1220 | ||||
Month |
9 | ||||
Day |
22 | ||||
Master pay scale group |
A04 | ||||
Wage type |
ML02 (average) | ||||
Labor time |
Confirmation value |
6 (hours) |
6 (hours) |
6 (hours) | |
Rate |
- |
- |
DM 25.67 | ||
Amount |
- |
- |
DM 154.02 | ||
Additional data
The following list shows the individual wage elements cumulated for the period. If you have entered the Capping, Supplement, and Time wage time tickets as shown in the above example, you will find these wage elements in the list of monthly totals per pay scale group – differences in the payroll form for the subsequent time tickets.
Wage type |
Actual time |
Amount | |
|
ML09 Master wage group -1 |
|||
|
ML10 Master wage group |
8.00 |
0.00 DM | |
|
ML11 Master wage group + 1 |
|||
|
ML12 Master wage group +2 |
6.00 |
14.04 DM | |
Time- |
ML13 Master wage group +3 |
||
dependent |
ML14 Master wage group + 4 |
||
variable |
ML15 Master wage group +5 |
||
elements |
ML16 Master wage group +6 |
||
|
ML17 Master wage group +7 |
|||
|
ML18 Master wage group +8 |
|||
|
ML19 Master wage group +9 |
|||
|
MLDU Average |
6.00 |
13.98 DM | |
|
MLVZ Time-dep. total |
20.00 |
28.02 DM | |
|
ML29 Master wage group -1 |
| ||
|
ML30 Master wage group |
0.80 |
18.67 DM | |
|
ML31 Master wage group + 1 |
|||
|
ML32 Master wage group +2 |
2.40 |
61.63 DM | |
Performance- |
ML33 Master wage group +3 |
||
dependent |
ML34 Master wage group + 4 |
||
variable |
ML35 Master wage group +5 |
||
elements |
ML36 Master wage group +6 |
||
|
ML37 Master wage group +7 |
|||
|
ML38 Master wage group +8 |
|||
|
ML39 Master wage group +9 |
|||
|
MLVL performance-dep. total |
3.20 |
80.30 DM | |
|
Total gross amount |
3826.22 DM | ||