Show TOC
Functional Enhancements and Changes to Task Lists
Scope of Functions
The following features are new for task lists:
You can assign external service specifications to the operations for a task list. For Release 4.6A, it is also possible
to assign internal service specifications. The distinction as to
whether a service package is regarded as internal or external is made using the operation control key.
You do not have to maintain the purchasing data for operations with an internal control key.
The operation control key Service must be available for
operations, to which you want to assign service packages. If the external processsing field has the feature
Internally processed operation or Internally processed operation/external processing possible
, the service packages should be used for internal processing.
From Release 4.6A, you can determine all task lists, to which a
particular material is assigned as a component. However, the report does not determine any materials, which are entered in bills of
material for equipment or production resources/tools for a task list.