Maintaining the PI Sheet for Tablet Production 
Use
You maintain the PI sheet for material N-2100. With it, the system performs completion confirmations, posts material movements, and records in-process quality inspections.
Procedure
Menu Path |
From the Process Management node, choose PI Sheet ® Find |
Transaction Code |
CO60 |
Field |
Data |
Control recipe |
Control recipe number for destination TB |
Alternatively, search by |
|
Alternatively, search by |
|
All other entry fields |
Delete default values |

In the PI sheet, you have to execute a signature:
- At the start of the PI sheet
– At the end of all phases
- At the end of the PI sheet
Each time enter the user WF-PP-E and choose
.
Then the system requests a password.
Enter ENJOY IDES, then choose
.
You can use the value help to transfer the planned quantities as default values for the actual quantities to be reported.
If the dialog box does not appear, choose
.
The Record Results: Characteristic Overview screen appears.
Characteristics |
Result |
Sieve size |
0.15 (mm) |
Water content |
1.1 (%) |
Potency of active ingredient |
98 (%) |
The Valuation and Partial Lot Assignment dialog box appears.
The system assigns the inspection point to your batch 175-N-2100.
You return to the PI sheet.
If not, choose Assigned inspection points.
You can use the default help to adopt the planned value.
If the system requires your password, enter ENJOY IDES.