Use
The planning segment is the line segment that controls how the order quantities are displayed in the planning table. The planning table displays a row for the planning segment in the Material data section of the screen. In this row, you can check the planned orders dispatched to the line segment and, if necessary, change them.
You define the planning segment in the line hierarchy. You can change the planning segments from the planning table.
Integration
The planning segment is the basis of scheduling for lead time scheduling in conjunction with capacity planning. In lead time scheduling, the system carries out mid-point scheduling around this work center. In other words, the operation with the planning segment is the mid-point, and this is scheduled first. Starting from this operation, the system schedules the preceding and subsequent operations. The planning segment is usually the bottleneck work center.
The planning segment is the basis of scheduling in Sequencing. The production start and finish dates in the planning table always refer to the first or last takt of the planning segment, depending on whether you have set the view to line-on or line-off.
Features
The system defines the line hierarchy header as planning segment as default.
Actions
In the line hierarchy graphic, select a line segment and then choose
Planning segment.
Example of Sequencing
The following diagram shows a line hierarchy with no sort buffers. The planning segment is the line hierarchy header. The planning table therefore displays the production dates for the whole production line between "takt 1" and "takt 7".

The following diagram shows a line hierarchy with a sort buffer. You have defined "line segment 2" as planning segment. The planning table therefore displays the production dates for "line segment 2", between "takt 3" and "takt 5".