Variance Calculation - Changes for release 3.0

Description

In 3.0, price variances can be calculated in variance calculation. This function requires that the Material origin indicator in the costing view of the material master be set.

Change system parameters in customizing

The following changes were made in Customizing:

You can specify the following in the variance key:
The target cost version is a combination of the former variance version and target cost version. It indicates the basis on which variances are calculated and which variance variant is used.
In Release 3.0 or higher there is a new target cost version that compares the planned costs of the production order with the standard cost estimate of the material produced.
The variance variant points to a new variance category called input variances. If variances are settled to profitability analysis, the input variances must be added to the PA settlement structure.
If you calculate price variances in variance calculation, the percentage rates for the prices variances are not required.

For more information on this, see the Implementation Guide.

Changes to the interface

You call up variance calculation with Accounting -> Controlling -> Product cost accounting -> Order-related production / Repetitive mfg / Process mfg.

You carry out variance calculation at the end of the posting period. You do this by choosing Period closing ->

You calculate the variances for an order. You can choose whether you want to calculate variances for specific target cost versions or for all target cost verions in the controlling area.
You calculate variances for all orders within a plant. Variances are calculated for all target cost verions in the controlling area.

You can call up the following screens from the list:

The detail screen shows the following data for each order:
This screen lists the following data split according to fixed, variable and full costs:
All cost elements under which costs were posted to the order are listed. The following information is displayed for each cost element:
You can select a cost element from this list and call up two explanation screens:
In this screen, you see detailed information on how the system calculated the target costs for the selected cost element.
In this screen, you see detailed information on how the system calculated variances for the selected cost element.
If you choose Variance categories, the system displays a tree giving you an overview of the variance categories.