Linking Materials and Standard Networks 

Use

In assembly processing you need to link the material, to be used in the sales document item for, and the standard network

If you do not create this link, a dialog box appears when you create the sales document, in which you are asked to enter the standard network.

Procedure

  1. On the SAP R/3 screen, choose Logistics ® Project management ® Basic data and then Standard structures ® Network parameters from sales order ® Edit.
  2. A list of the existing links appears.

  3. Choose Edit ® Create parameters.
  4. An entry screen appears.

  5. Enter the material number, order type, standard network, and a profile for the network to be created.

You specify the network type (order type) itself in the requirements class. Here you specify for which network types the link is valid. If you enter *, the standard network is valid for all network types.

You can also enter:

You can either enter the MRP controller directly or specify where the system should take the information from, the network profile (1) or the material master (2).

  1. Save your entries.