Show TOC

Selection of Requirements Type Through SD Item Category

Here you check the parameters that influence the setting of the requirements type through the item category group in the material master record and the order type of the SD document. Entering 1 and 2 in the Source field of the step "Control of requirements type determination" means that the item category and the requirements type take priority over the MRP group in the material master record.