Preliminary Costing for Product Cost Collectors 

  1. You are in the Display Product Cost Collectors screen.
  2. Choose .
  3. On the Change Product Cost Collector screen, choose Cost.
  4. In the status bar, you see the result of your costing run.

  5. Choose Goto ® Display cost estimate.
  6. In the Display Material Cost Estimate with Quantity Structure screen the costing results are displayed with the costing structure on the left-hand side of the screen.

  7. Enlarge the left screen area to enable you to display the costing values per BOM item.
  8. In the upper window you can display additional information on the costing by using the various tab pages.

  9. Choose to display in the lower part of the window an itemization for the costing.
  10. Choose until the overview tree appears.