Show TOC
LIS: Flexible analyses: Generate evaluation
structure upon request
Description
With Release 3.0A there is in the flexible analyses of all of the
information systems of the Logistics Information System (LIS) a change when
creating/changing an evaluation structure and when creating an evaluation. The
following illustrate various cases:
1. If the information structure, to which
the evaluation structure refers, has changed, then the evaluation structure
will be newly generated by the system.
2. If the information structure no longer
exists, to which the evaluation structure refers, then the evaluation
structure will be deleted by the system.
3. If there is no evaluation structure but
an information structure with the same name, then the evaluation structure
will be newly generated to the information structure.