Simulation Costing
In this step you make all settings for base
object costing. This includes the following:
You specify the
costing sheet in the master data of base object costing.
You specify the
overhead key in the master data of base object costing.
You execute base
object costing on the basis of a costing variant.
You specify the
costing type in the costing variant.
You specify the
valuation variant in the costing variant.
The standard system contains predefined costing
variants.