Process Orders (PP-PI-POR)
   Process Order
   Data Flow During Process Manufacturing
   Process Order Management
      Order Processing
      Order Closing
   Creating Process Orders
      Creating Process Orders With Material & Master Recipe
         Production Version Selection
            Selecting Production Versions Manually
         Selecting a Master Recipe
            Parameters in Customizing
            Validity of the Recipe
            Automatic Master Recipe Selection
               Selection Priorities
                  Example: Selection Priorities
         Automatic Batch Creation
         Operation Overview
         Changing Operation/Phase Data
         Changing Process Instructions
         Assigning Values to Process Instruction Characteri
      Creating Process Orders with a Material and Without a Master Rec
      Creating Process Orders Without a Material and With a Master Rec
      Creating Process Orders Requiring Approval
      Converting Planned Orders Collectively
      Converting Planned Orders Individually
      Partially Converting Planned Orders
   Scheduling
      Scheduling Types
      Scheduling Parameters in Customizing
      Changing the Scheduled Dates Manually
      Order Floats
      How the Control Key Influences Scheduling
      Scheduling Phases
      Scheduling Rules
      Secondary Resource Scheduling
      Midpoint Scheduling and Capacity Scheduling
      Capacity Requirements
      Scheduling Log and Results
      Scheduling and Scheduling Results on the Screen
   Material List Components
      Data from the Material List
      Creating a Process Order for a Material without a Material List
      Entering or Changing Material Components in the Ma
      Component Detail Screens
         Assigning Components
         Creating Components
         Reassigning Components
         Sorting Components
         Filtering Components
         Deleting Components
         Classifying Material List Components
         Example: Batch Splitting
      Material Quantity Calculation
         Basic Functions of Material Quantity Calculation
            Example: Calculating Product and Component Quantities
         Material Quantity Calculation With Batch Data
            Example: Calculations Using Active Ingredient Quantities of Batc
            Example: Calculations Using Physical Batch Quantities
         Defining Material Quantity Calculation
         Performing Material Quantity Calculations
         Displaying and Printing Formula Overviews
   Checking the Availability of Material
      Checking Group
      Check Rule
      How is the Availability of Materials Determined?
      At What Level is the Availability Check Carried Ou
      Checking the Availability of the Materials in an Order
         When is the Availability Checked?
      Collective Availability Checks
      Carrying Out Availability Checks
      Checking Collective Availability Online
   Preliminary Costing
      Cost Elements
      Planned Costs for Components
         Planned Costs for Materials Manufactured In-House
         Planned Costs for Materials Procured Externally
         Manufacturing Costs
         Planned Costs for Production
         Planned Costs for Internal Activity
      Setting up a Quantity Structure
      Overhead Costs
      Overhead Groups
   Releasing Process Orders
      Releasing Process Orders
      How to Release Operations and Phases
      Collective Release of Process Orders
      Actual and Planned Data after Order Release
      Deviation Recording
   Inspection Lots/Inspection Characteristics
      How to Create Inspection Lots
      How to Delete Inspection Lots
      Partial Lot Creation from the Process Order
      Creating Inspection Characteristics
         How to Delete Operations With Inspection Character
   Printing
      Printing Shop Floor Papers
   External Processing
   Goods Movements
      Planned Withdrawal of Material Components
      Unplanned Withdrawal of Components for an Order
      Delivery to the Warehouse
      Automatic Goods Receipt
         What Checks are Carried Out During a Goods Receipt
      Delivery to Stock: Costs
      Delivery to Stock: Updates in the Material Master
      Delivery to Stock: Updates in the Order
      How to Post a Goods Receipt
   Completion Confirmations in Process Orders
      Which Objects Can Be Confirmed?
      What Data Can You Confirm?
      Fixed Parameters in Completion Confirmations
      Variable Parameters in Completion Confirmations
      Entering Completion Confirmations
         How to Enter Confirmations at Phase Level
         How to Enter Confirmations at Order Level
         Entering Collective Confirmations
      Goods Movements and Confirmations
         Reworking Goods Movements
            How to Rework Goods Movements
      Reworking Actual Costs
         How to Redetermine Actual Costs
      Running Confirmation Processes Separately
      Canceling Completion Confirmations
         How to Cancel a Completion Confirmation
         How to Display Canceled Confirmations
      Decoupling of Confirmation Processes
         Settings for Decoupling Processes Carried Out Duri
         Example: Background Processing
         Processing Predefined Confirmation Processes
   Order Settlement
   Order Closing
      Technical Completion of Process Orders
      Business Closing of Process Orders
   Archiving
   Mass Processing
   Status
      System/User Statuses
         Display Status
      Status in Process Orders
      Business Transactions
      What is a Status Profile?
      What is a Selection Profile?
   Co-Products
      Process Orders with Co-Products: Prerequisites
      Co-Products: Costs
      Co-Products: Using a Source Structure
   Information Systems
      Order Information System
         Search Optimization
         Order Information System: Profiles In Customizing
         Object Overview
         Object Detail List
         Collective Availability Checks