Show TOC

General

The settings you make in this section apply to the task list group as a whole or to the task list header.

You are only offered the settings that are important for maintaining task list types Q and S. In the Implementation Guide for Production, you can find additional settings for task lists that you normally do not need when you use task list types Q and S. Nevertheless, you should familiarize yourself with these settings and the implementation projects for other task list types, so you do not make any settings that could adversely affect the QM component.

Note

: The following functions for task list determination are offered in the Implementatuion Guide for Production and you can use these to control user-related and automatic task list selection. Although these functions are not supported for inspection plans, there must be an entry with the key Q* in the relevant tables. Check if these entries exist and if not, transfer the entries form the standard client.

The inspection plans are linked to the central engineering change management function for Logistics objects. Refer to the section Logistics, Engineering change management for a description of the settings.

Some fields in the task list header are only required to record inspection results based on characteristics. These include:

To carry out these steps, see the Results Recording subsection of the Quality Inspection section.