Standard Analysis Example Scenario 
Use
This standard analysis shows you an example of a customer-specific extension.
The communication structure MCWF_TRANS is extended, and the data retrieval for the extension is placed in the subroutine WIS_CODING_TEMPLATE.
Integration
The information structure S304 forms the data basis for the standard analysis Example scenario. This information structure only contains the data of completed work items of the single-step task TS30000016 in the workflow template WS20000011.
Prerequisites
The information structure S304 has to be filled with data. This is done by transferring the data to the LIS with the program RMCADATA, that has to be scheduled periodically as a job. The update rules for the standard analysis Example scenario determine which data from the runtime tables is copied to the information structure S304.
Features
Characteristics
The standard analysis Example scenario uses the following characteristics: (The characteristics are given in the order in which they are shown.)
Key figures
Number
Number of work items for each selected characteristic.
Total time
The cumulative total time is the sum of wait time and process time (in hours).
The wait time is the difference between the start of processing (= first switch to status in process) and the creation time of the work item.
The process time is the difference between the end of processing (= switch to status completed) and the start of processing (= first switch to status in process) of the work item.