Show TOC
PM: Chang. to Terminology in Area of PRM Work
Schedul./Mainten. Plan.
Description
Qualification -> Suitability
The term qualification is used
exclusively for the general qualification descriptions of the HR System (Human
Resources) which can now also be allocated in Logistics. You can still use the
previous qualification descriptions as suitability for
information purposes.
Call interval -> scheduling period
When a maintenance plan is scheduled, the
scheduling records created by the system must still be released before an
order can be called. The term call interval has therefore
been replaced by the term scheduling period.
Opening period -> call horizon
The term opening period has
been replaced by the term call horizon , as the call horizon
is a percentage of the maintenance cycle rather than a period. Once this
horizon is reached, the system releases the maintenance call automatically the
next time the maintenance plan is scheduled, and a maintenance order is
created when the maintenance plan is saved.
Strategy graphic -> Package sequence