Show TOC

PM: Chang. to Terminology in Area of PRM Work Schedul./Mainten. Plan.

Description

Qualification -> Suitability
The term qualification is used exclusively for the general qualification descriptions of the HR System (Human Resources) which can now also be allocated in Logistics. You can still use the previous qualification descriptions as suitability for information purposes.
Call interval -> scheduling period
When a maintenance plan is scheduled, the scheduling records created by the system must still be released before an order can be called. The term call interval has therefore been replaced by the term scheduling period.
Opening period -> call horizon
The term opening period has been replaced by the term call horizon , as the call horizon is a percentage of the maintenance cycle rather than a period. Once this horizon is reached, the system releases the maintenance call automatically the next time the maintenance plan is scheduled, and a maintenance order is created when the maintenance plan is saved.
Strategy graphic -> Package sequence
The function key for displaying a maintenance strategy was renamed package sequence.