Use
During the MRP run, the system determines the material requirements that are needed to produce the production lot, and creates the necessary procurement elements with reference to the production lot (WBS element).
Prerequisites
Features
Activities
In order to carry out material requirements planning, starting from the MRP menu, you choose: Total planing, Sng-item, multi-lvl or Sng-item project.