Carrying out the MRP Run 

Use

During the MRP run, the system determines the material requirements that are needed to produce the production lot, and creates the necessary procurement elements with reference to the production lot (WBS element).

Prerequisites

Features

Activities

In order to carry out material requirements planning, starting from the MRP menu, you choose: Total planing, Sng-item, multi-lvl or Sng-item project.