Capacity Planning Example in the Planning Table 
Given data:
Procedure
Result
The system sets the load on the 07.30. to 100% and the load of the start date 07.29. to 50%. The available capacity, capacity load and requirements for both days are displayed with 100% and 50% respectively if no other production quantities exist on these days. However, the total production quantity of 750 pieces remains on the 07.30. if you have selected the Orders quantity display. The production quantity is split over the two buckets if you have selected the Distributed or the Orders/Distr. quantity display.
If several orders already exist, the system automatically increases the capacity load and the capacity requirements if you increase the production quantities by creating a new order, for example. Capacity overloads are then highlighted.