Capacity Planning in the Planning Table 
Use
For each production line and per period, the system displays the available capacity, capacity requirements and the capacity load as a percentage. The capacity data is recalculated after making any changes. Therefore, the planner has an overview of the capacity situation of the production lines and can react quickly to overloads.
Prerequisites
For more information, please refer to the Implementation Guide (IMG) for Repetitive Manufacturing, under Capacity Planning.
If your production lines are subdivided into individual lower-level elements, such as processing stations, you must create a line hierarchy for the production line and define a work center as the planning segment in the line hierarchy. If you have not defined otherwise, the system automatically uses the header of the line hierarchy as the planning segment. The planning segment must also be used in the routing. The operation with the planning segment is then used for scheduling.
Features
The system displays the capacity data for the selected lines in the upper section of the planning table. In the standard settings, if more than two lines were selected, the system initially displays only the capacity load as a percentage for one production line.
You then have the following options:
Minimum number of personnel per period.
Maximum number of personnel per period.
For more information, see: