Accessing Detailed Information 
Procedure
In the planning table, you can obtain detailed information on individual lines by double-clicking the various fields.
Result
The system displays the receipt elements of each period. Depending on your settings you can use the production dates and not the basic dates for selecting and sorting. You can select and change the receipts by double-clicking them.
The system displays the requirements of each period.
The system displays the complete stock/requirements situation for the material (or for the MRP segment).
The dates of the MRP elements of the selected period are highlighted.
The system always displays the basic dates for the receipt elements as the available quantity is based on the basic dates. You can select and change the receipts by double-clicking them. If you access a dialog box for a complete material situation, the system carries out a rescheduling check in the background to display the current exception situation.
This list is also structured as a table similar to the stock/requirements list.
You can change the planned orders and production orders in the list by double-clicking them.