To display the overload for individual work centers (capacity categories), proceed as follows:
You get to see the dialog box Capacities with a list of the work centers and capacity categories for the material selected.
It shows the maximum load for every capacity category, that means the absolute value for the maximum load. If the value exceeds the available capacity then it is highlighted.
The overload, that is the value as of which the availability is exceeded, is usually set at 100%. A capacity is overloaded at a particular date if the requirements are not less than or equal to the available capacity. You can specify any other percentage values you like. To do this proceed as follows:
The system displays the dialog box Settings for overload display.
The system carries out the overload check using the changed values.