Scheduling Log 

If there are errors in scheduling (such as dates not specified in a calendar or incomplete data), the scheduling run is not interrupted. The errors that arise are written to a scheduling log. The system schedules the order in spite of incomplete data. You can evaluate the log afterwards to analyze the errors and eliminate them.