Converting the Planned Order into a Production Order 
Menu Path |
From the MRP node, choose Evaluations ® Stock/Requirements List |
Transaction Code |
MD04 |
Field |
Data |
Material |
T-CV |
Plant |
1000 |
The Create Production Order: Header screen appears.
You now see the operations.
Make a note of the final operation in the list.
Write down the production order number displayed in the status bar.
You see that the planned order has now been converted into a production order.