You must meet the following requirements if you want to create a process order with co-products:
- Activate the indicator Co-product in the material master of the co-product (MRP 1 screen).
- The co-product must exist as a component in the material list of the main product (negative quantity, item type L).
- The indicator Co-product must be activated in the General data screen of the material component.