Whether a phase is calculated depends on the control key and the costing relevancy indicator of the phase.
- Using the control key of the phase, you can specify whether the phase is relevant to costing.
- If the phase is relevant to costing, you can additionally use a costing relevancy indicator to specify the factor that is to be used to calculate the services performed in a phase or you can disconnect the phase from costing. Operations are automatically excluded from costing.