Creating Process Orders Requiring Approval 
Use
For production in compliance with Good Manufacturing Practices (GMP), process orders must be approved before production. You can do this in the following ways:
Integration
Master data is approved in engineering change management. You therefore require the Engineering Change Management (LO-ECH) component to do this.
Prerequisites
You make the following settings for order types to specify that an order must be created with approved master data (see Customizing for the Process Order, Order-Dependent Parameters, Mast. data tab page):
For collective orders, you must also make these settings for the order types of subordinate orders.
Features
Master Data Selection
When you create a process order requiring approval, the master data selection procedure is the same as for orders that do not require approval.
Checking the Approval
The system then checks whether the master data has been approved. Before the process order can accept the master data on which it is based (recipe, BOM, production version) as approved, the following prerequisites must be met:
For more information on the approval procedure for master recipe changes, see
Engineering Change Management and Recipe Approval. 
If you manufacture in compliance with GMP, note the following:
The approval procedure is not supported for BOMs of phantom assemblies.
Further Processing
If the prerequisites are not met,
If the prerequisites are met,
Exceptions when Approving Collective Orders
Each order in a collective order is checked individually and approved independently of the other orders. If, for example, approval is denied for a subordinate order, approval is not withdrawn automatically for the higher-level order or the collection as a whole.
For each non-approved order in the collective order, an individual approval is required to meet the prerequisites.
The collective order cannot be released until all orders have been approved.
Activities
Create process orders that require approval
: Follow the steps outlined in Creating Process Orders with Material and Master Recipe.Display log on withdrawal of approval: Goto ® Logs ® For reading master data.
Withdrawal of approval: Process order
® Functions ® Approval ® Withdraw approval(Individual) Approval: Process order ® Functions ® Approval ® Individual approval