Editing Operations/Phases 

Prerequisites

The following data has been created in the system:

Procedure

  1. Go to the operation overview (Operations tab page) of your master recipe.
  2. From the recipe overview, you can access the operation overview by double-clicking the corresponding recipe.

  3. Enter operation and phase data on the operation overview.

The following table tells you:

Field

For Operations

For Phases

Default Value from

Operation/phase number

X

X

Recipe profile

Phase indicator

 

X

 

Superior operation

 

X

 

Destination ( control recipe destination)

 

X

Recipe profile or resource

Resource ( primary resource)

X

Taken from operation

 

Control key

X

X

 

Standard text key

X

X

Resource

Description

X

X

 

 

You can change the default values in the recipe, provided that they have not been marked as references in the resource.

If required, you can also change the recipe profile in the recipe (see Changing Recipe Profiles in Recipes).

  1. Choose .

If you must enter standard values for an operation or phase, the system automatically takes you to the Standard values tab page.

Enter the standard values as required.

  1. If you want to enter further detail data, double-click the relevant operation or phase on the operation overview.
  2. Choose the General data, Standard values, or User fields tab page and enter data as required. For more information, see:

If you have replaces the resource of an operation in step 2, do not forget to check all standard values of the operation and its phases.

  1. Save the master recipe.