Distribution Resource Planning (DRP) 

Purpose

The objectives of Distribution Resource Planning (DRP) in the SAP System are:

During the net requirements calculation the system compares the available stock and the planned receipts from the source of supply with the planned independent requirements and the incoming sales orders. If there is a material shortage (available stock is less than the quantity required), the system creates an order proposal.

The DRP process can be used for the entire supply chain including the production plants. DRP includes the production and purchasing in the planning process for the production plant.

Prerequisites

In order to perform a DRP run, you must:

Process flow

Schedule the DRP runs for your network as you would a planning run.

  1. Select or change the appropriate segment of your distribution network.
  2. Within Flexible Planning create a requirements forecast for distribution centers and plants.
  3. After the forecast results have been transferred to demand management, the relevant planned independent requirements are generated.
  4. These planned independent requirements are converted in the various variants of the DRP run into concrete purchase requisitions or orders.

Result