If you set this indicator, no skip (skip lot) can take place.
If you set this indicator, when calculating samples the system chooses the next inspection stage contained in the dynamic modification rule that is not a skip, instead of the skip stage that has been predefined by the quality level.
You can also prevent inspection characteristics being skipped as follows: