Example 1 for Make-to-Stock REM 

You can use this planning process if you are looking for a lean planning process in the system. It makes sense to use this process if you work in the consumer products industry and manufacture materials on a fully automated production line. You use takt-based scheduling and do not carry out lead time scheduling via the routing.

Prerequisites

You define the master data for this process in Line Design.

Process flow

  1. Carry out an MRP run.
  2. Access the planning table with Sequencing. The system carries out takt-based scheduling.
  3. Check the production quantities in the planning table. If necessary, you can also plan other quantities.
  4. You can also display the production quantities as order bars in the sequence schedule where you can process them graphically.