Example 1 for Make-to-Stock REM 
You can use this planning process if you are looking for a lean planning process in the system. It makes sense to use this process if you work in the consumer products industry and manufacture materials on a fully automated production line. You use takt-based scheduling and do not carry out lead time scheduling via the routing.
Prerequisites
You define the master data for this process in Line Design.
Process flow