Determining the Firming Date Manually 

Use

In the planning table, you can lengthen the planning time fence for a material so that it is longer than the planning time fence defined in the material master. However, you cannot shorten the planning table fence.

Procedure

  1. Select Edit ® Set manual firming date. The system displays the dialog box Set Manual Firming Date.
  2. Enter the appropriate firming date and choose Continue.
  3. To save the firming date, save the planning table.